I have stacked some tasks for it to carry out by powering off an entire vapp at the same time as bringing one up.
This is also seeing the same result.
Only 2 tasks are being carried out by VC every 5 mins.
It is exactly on the 5 mins aswell. 20, 25, 30, 30, 35 etc.
If I start the tasks in between times it does the initial first VM task then waits for the next 5 min cycle and adds its tasks to the stack?
Very Weird?
Its as if a setting is preventing any more than 2 VC tasks per 5 min interval